Evaluating the impact of uncertainty and variability on the value chain optimization of a forest biomass power plant using Monte Carlo Simulation

Nazanin Shabani,Taraneh Sowlati
DOI: https://doi.org/10.1080/15435075.2014.993764
IF: 3.206
2015-01-29
International Journal of Green Energy
Abstract:Mathematical programming models have been used to optimize the design and management of forest bioenergy supply chains. A deterministic mathematical model is beneficial for making optimum decisions; however, its applicability to real-world problems may be limited because it does not capture all the complexities, including uncertainties in the parameters, in the supply chain. In this paper, a combination of Monte Carlo Simulation and optimization model is used to evaluate the impact of uncertainty in biomass quality, availability and cost, and electricity prices on the supply chain of a forest biomass power plant. The optimization model is a deterministic mixed integer non-linear model with monthly time steps over a 1-year planning horizon. Variability in biomass quality, i.e. moisture content (MC) and higher heating value (HHV), based on the historical data of a real case study is studied in detail and fitted probability distributions are used in the model, while for electricity prices different scenarios are considered. The results show that the impact of variability in the MC on profit is higher than that of uncertainty in HHV. It is observed that the annual profit ranges between $13.3 million and $17.9 million in the presence of all possible uncertainties while its average is $15.5 million. Uncertainty in biomass availability and cost and electricity price results in the risks of having annual profit of less than $14 million and low monthly storage levels.
energy & fuels,thermodynamics,green & sustainable science & technology
What problem does this paper attempt to address?