Research and Application of Integrated Scheduling System of Steelmaking-Continuous Casting-Hot Rolling in Shagang Group

Liu Lijun,Wen Zhi,Su Fuyong,Dou Ruifeng,Liu Xunliang,Lou Guofeng
DOI: https://doi.org/10.1007/978-3-642-27329-2_65
2012-01-01
Abstract:In this paper, a mathematical model of scheduling system is developed based on the analytical investigation in Steelmaking-Continuous Casting-Hot Rolling process, additionally, according to which an integrated scheduling system is established and being put into practice in Shagang Group. The application of the system achieves that more than 90% hot delivery and hot charging ratio is conserved in the process, more than 5% oxidization loss is reduced in the process of Continuous Casting (conticast) slabs and consumption of reheating furnace is ≤0.95GJ/t in per kilo product.
What problem does this paper attempt to address?