Development and Application of Computer Aided Hot Metal Scheduling System in Ansteel

WANG Hai-ying,GAO Jun-jun,GUO Ya-jun,LIU Da-cheng,LU Ying
DOI: https://doi.org/10.3969/j.issn.1000-7059.2006.05.004
2006-01-01
Abstract:In order to improve Ansteel hot metal scheduling management and meet the need of overall information in Ansteel,based on long term field research and advanced design thinking and information method,a computer aided hot metal scheduling system was developed.Successful application of the system raised working efficiency and decreased cost.
What problem does this paper attempt to address?