Challenges of constructing a twin 5.2 km long undersea fuel pipelines by HDD method

Keith W. K. Kong
DOI: https://doi.org/10.1080/14488353.2020.1735027
2020-01-02
Australian Journal of Civil Engineering
Abstract:Due to the expansion of the existing Hong Kong International Airport, known as the Three Runway System, two new 500 mm diameter, 5.2 km long aviation fuel pipelines were proposed to be built through bedrock undersea to replace the two-existing submarine aviation fuel pipelines running between the Western Quay of the Airport and the offshore Aviation Fuel Receiving Facility (AFRF) at Sha Chau. Having considered the site constraints with the expansion works for the new airport island, and minimising the disturbance of marine environments and ecology, a trenchless method using horizontal direction drilling (HDD) technique that is a cost-effective and environmental-friendly solution was adopted to complete these two aviation fuel pipelines' installation. Numerous challenges were encountered for constructing this 5.2 km long subsea pipeline using HDD method that is the longest record in the world at the time. Although the mission of the project seemed impossible, the challenge still can be defeated by incorporating technology, advanced equipment, knowledge and good practice of project planning.
What problem does this paper attempt to address?