The antecedents of construction project change: an analysis of design and build procurement application

Jessica Smith,David John Edwards,Igor Martek,Nicholas Chileshe,Susan Hayhow,Chris J. Roberts
DOI: https://doi.org/10.1108/jedt-12-2020-0507
2021-02-26
Journal of Engineering, Design and Technology
Abstract:Purpose This study aims to excoriate, define and delineate the main drivers of “change” in commercial construction projects and generate guidelines on how to minimise exposure to the associated adverse effects upon project stakeholders. Design/methodology/approach The research adopts mixed doctrines through a combination of epistemological lenses, embracing two primary philosophical stances: interpretivism, to identify the primary drivers of change based on a systematic literature review and a post-positivist, inductive approach to analyse the results of change within a Joint Contracts Tribunal (JCT) Design and Build (D&B) construction project case study. Findings The causal nexus of change during the construction phase is assessed and delineated; the key affecting factors are thematically grouped under headings: extent and severity; time in relation to implementing; instigating party; individual(s) responsible for managing the change; reason for the change; available resource; recoverable or non-recoverable; contract/project type; and type of client. Following this, the effects of change on key elements of the project are encapsulated and recommendations for adaptations which may provide improved experiences are offered. Originality/value The study tackles the common issue of managing the deleterious effects of change on commercial construction projects, defining management techniques to minimise stakeholder tribulation.
What problem does this paper attempt to address?