Study on the Velocity of the Temporary Plugging Agent Along Wellbore in a Fracturing Operation

Xiangwei Kong,Hongxing Xu,Jianwen Shen,Yang Zhang,Tengfei Sun
DOI: https://doi.org/10.1007/s10553-022-01366-8
2022-03-01
Chemistry and Technology of Fuels and Oils
Abstract:In this study, considering the factors of gravity, buoyancy, drag force, inertia force, and so on, the migration movement model of the temporary plugging agent is established. The migration trajectory of the temporary plugging agent can be directly obtained by using the four-order Runge-Kutta method and by the input of the initial conditions. With the help of programming language, the model is solved and a specific well example is taken as an example. The results show that the acceleration of the temporary plugging agent increases with the increase of density at the initial stage. When the temporary plugging agent accelerates to a certain speed, the resistance increases with the increase of speed, the combined external force gradually decreases until the combined external force is 0, and the temporary plugging agent keeps uniform motion. The migration velocity of the temporary plugging agent increases with the increase in displacement. With increase in the well depth, the temporary plugging agent migrates from an inclined section to a horizontal section. The migration speed of the temporary plugging agent can provide help for targeted temporary plugging.
energy & fuels,engineering, chemical, petroleum
What problem does this paper attempt to address?