Application of WBS in Pricing Management of Prefabricated Concrete Construction Project

Jinli Su,Xiaolu Zheng
DOI: https://doi.org/10.1088/1755-1315/719/3/032014
2021-04-01
IOP Conference Series: Earth and Environmental Science
Abstract:Abstract The standard of measurement and valuation is the main basis for making the bill of quantities and compiling the bidding control price and bidding quotation. In recent years, prefabricated concrete building, as a typical structural form of prefabricated building, has developed rapidly. However, in the actual operation of measuring and pricing of prefabricated concrete construction projects, the existing list system has many shortcomings. Based on this, it is necessary to optimize the measurement specifications of prefabricated concrete buildings in China. At first, this paper USES the principle of the work breakdown structure (WBS) specifications for the measurement of the current prefabricated concrete building structure is analyzed, secondly in jinan city project as an example, to find out its branch, the branch of engineering and engineering subdivisional work on decomposition structure of the preliminary optimization, using WBS to metrological specification for the perfection of prefabricated concrete construction measurement valuation in China to provide the basis.
English Else
What problem does this paper attempt to address?