Multifield Environmental Analysis and Hazards Prevention of Steeply Inclined Deep Coal Mining

Xingping Lai,Jingjing Dai,Haidong Xu,Xingzhou Chen
DOI: https://doi.org/10.1155/2021/6651088
IF: 1.843
2021-05-24
Advances in Civil Engineering
Abstract:Due to the different in-situ stress level, mining stress state, and surrounding rock properties of steeply inclined deep coal mining, the mutation mechanism of underground engineering rock mass is complex. This paper studies the cause and control of mining disaster of steeply inclined deep coal resources in Wudong coal mine. The results show that the structural field is the key of multifield analysis, and particularly a large area of suspended roof is easy to expand energy and induce dynamic hazards. By means of borehole television- (BT-) transient electromagnetic (TEM) detection, it is found that there are hidden dangers of roof safety and suspected water hazards in Wudong coal mine, and the roof above the detection area (+575 m south roadway to 2250–2600 m) is in a suspended state; there is a suspected water-rich area in the range of 2320–2340 m and 2390–2400 m, and the lowest vertical height is +613.8–+615.5 m. Exploring and releasing the water in the aquifer effectively reduced the water pressure; in +575 m south roadway, +587 m measure roadway, and blasting chamber, the suspended roof blasting holes are constructed. Microseism- (MS-) TEM monitoring shows that the apparent resistivity fluctuates significantly, the microseismic energy and events have been significantly reduced, and it is maintained at a low level for two consecutive weeks, confirming the effectiveness of the stable release of the high-stress roof in the +575 m near stope area; at the same time, the safeguard measures for long-term roof dynamic monitoring are constructed.
construction & building technology,engineering, civil
What problem does this paper attempt to address?
The problem that this paper attempts to solve is the complexity of the multi - field environment and the resulting dynamic disaster problems in the mining of steep - dipping deep coal seams due to factors such as high hydrostatic pressure, strong engineering disturbances, and complex surrounding rock properties. Specifically, the paper focuses on the engineering - geological environment and multi - field coupling system analysis of the steep - dipping deep coal seams in Wudong Coal Mine, and realizes the multi - field visual characterization of deep coal - rock masses through the BT - TEM detection technology. Based on this, measures for the stable release of high - stress hanging roofs in deep near - stope areas are proposed, combined with water exploration and drainage technologies to control dynamic disasters, and long - term monitoring measures are established to ensure the safety of the roof dynamics in Wudong Coal Mine. The main research object of the paper is Wudong Coal Mine, which is located on the northern limb of the Beiao syncline in Urumqi, China. It has a monoclinic structure with a dip angle of about 45°. The thicknesses of the main coal seams are 37.5 meters and 47.8 meters respectively. Under such geological conditions, as the main mining level enters the deep part, the catastrophic development mechanism of the underground engineering rock mass becomes more complex, and the multi - field coupling phenomenon also increases the difficulty of disaster control. To meet these challenges, the paper adopts the following methods: 1. **Multi - field coupling analysis**: Analyze the coupling relationships among the structural field, stress field, fracture field, and seepage field of the steep - dipping deep coal - rock mass. 2. **BT - TEM detection**: Use borehole television (BT) and transient electromagnetic method (TEM) to detect the spatial distribution characteristics of potential disaster sources, such as type, scale, and depth. 3. **Hydro - exploration and drainage**: Determine the water - rich areas through TEM detection and implement water exploration and drainage measures to effectively reduce water pressure. 4. **Large - area hanging roof pre - splitting**: Arrange roof blasting holes in the + 575 - meter south roadway, + 587 - meter blasting chamber, and measurement roadway to achieve the stable release of the hanging roof. Through these measures, the paper verifies the stable release effect of the high - stress hanging roof, and further confirms the effectiveness of the measures through means such as micro - seismic monitoring and formation movement observation holes. These research results are of great significance for improving the safety and efficiency of the mining of steep - dipping deep coal seams.