Column generation for minimizing total completion time in a parallel-batching environment

A. Alfieri,A. Druetto,A. Grosso,F. Salassa
DOI: https://doi.org/10.1007/s10951-021-00703-9
2021-10-01
Journal of Scheduling
Abstract:Abstract This paper deals with the $$1|{p-\text {batch}, s_j\le b}|\sum C_j$$ 1 | p - batch , s j ≤ b | ∑ C j scheduling problem, where jobs are scheduled in batches on a single machine in order to minimize the total completion time. A size is given for each job, such that the total size of each batch cannot exceed a fixed capacity b . A graph-based model is proposed for computing a very effective lower bound based on linear programming; the model, with an exponential number of variables, is solved by column generation and embedded into both a heuristic price and branch algorithm and an exact branch and price algorithm. The same model is able to handle parallel-machine problems like $$Pm|{p-\text {batch}, s_j\le b}|\sum C_j$$ P m | p - batch , s j ≤ b | ∑ C j very efficiently. Computational results show that the new lower bound strongly dominates the bounds currently available in the literature, and the proposed heuristic algorithm is able to achieve high-quality solutions on large problems in a reasonable computation time. For the single-machine case, the exact branch and price algorithm is able to solve all the tested instances with 30 jobs and a good amount of 40-job examples.
engineering, manufacturing,operations research & management science
What problem does this paper attempt to address?