ENVIRONMENT MANAGEMENT MATURITY EVALUATION OF LARGE-SCALE WATER CONSERVANCY AND HYDROPOWER ENGINEERING PROJECT BASED ON GIOWA OPERATOR

Yang Ling-ling
Abstract:To evaluate the environment management maturity of large-scale water conservancy and hydropower engineering project,some characteristics of large-scale water conservancy and hydropower project are discussed in this paper,and the positive and negative effects of planning phase,construction phase and operation phase on the ecological environment are analyzed.An environment-friendly large-scale water conservancy and hydropower construction project management maturity model is constructed based on previous project management methods,subsequently the composition,contents and evaluation methods are also defined.With the knowledge system of project management as a guide,this study proposed an index system of project management maturity comprehensive evaluation which was analyzed by an evaluation method based on GIOWA operator and AHP.To verify the validity and utility of this evaluation method,an example is proposed.The result suggests that the main factor which restricts the maturity of large-scale water conservancy and hydropower engineering project is the degree of controlling over the environment after considering environmental factors,and the overall level of project management has yet to be improved.The result provides a direction for the environment protection and management of large-scale water conservancy and hydropower projects.At the same time,this study presented environment-friendly project management theories and standards,which are significant for managers.
Environmental Science,Engineering
What problem does this paper attempt to address?