Solution approaches for the soft drink integrated production lot sizing and scheduling problem

Deisemara Ferreira,Reinaldo Morabito,Socorro Rangel
DOI: https://doi.org/10.1016/j.ejor.2008.03.035
IF: 6.4
2009-07-01
European Journal of Operational Research
Abstract:In this paper we present a mixed integer programming model that integrates production lot sizing and scheduling decisions of beverage plants with sequence-dependent setup costs and times. The model considers that the industrial process produces soft drink bottles in different flavours and sizes, and it is carried out in two production stages: liquid preparation (stage I) and bottling (stage II). The model also takes into account that the production bottleneck may alternate between stages I and II, and a synchronisation of the production between these stages is required. A relaxation approach and several strategies of the relax-and-fix heuristic are proposed to solve the model. Computational tests with instances generated based on real data from a Brazilian soft drink plant are also presented. The results show that the solution approaches are capable of producing better solutions than those used by the company.
operations research & management science
What problem does this paper attempt to address?