HVDC/ HVAC transmission network expansion planning in electricity markets in the presence of wind resources

Reza Heydari,Taghi Barforoushi
DOI: https://doi.org/10.1016/j.epsr.2024.110182
IF: 3.818
2024-01-29
Electric Power Systems Research
Abstract:The growing integration of renewable resources puts stress on the transmission network due to the growth of power flow and power production uncertainty and so increases complexities in the transmission network expansion planning (TNEP). Traditional TNEP is accomplished with high-voltage alternating current (HVAC) lines. However, attention to high-voltage direct current (HVDC) lines has increased. This paper proposes a new framework to solve the TNEP problem, including HVAC and HVDC lines simultaneously in electricity markets, under the uncertainty of wind power. The proposed model is designed as a risk-constrained stochastic bi-level optimization problem that, at the upper level, optimal investment decisions are made by the transmission system operator (TSO). The lower-level problems involve network-constrained market-clearing to maximize social welfare. Based on duality theory, the framework is formulated as stochastic mathematical programming with equilibrium constraints (MPEC) problem. This stochastic MPEC is converted into a mixed-integer linear programming (MILP) problem. The proposed model is examined using Garver's six-bus test system and the modified Southern Brazilian system (SBS). According to the results, considering HVAC and HVDC simultaneously in the TNEP has decreased the investment cost, and increased the expected social welfare.
engineering, electrical & electronic
What problem does this paper attempt to address?