Stochastic Transmission Expansion Planning Considering the Transmission Overload Risk

Haiyang Jiang,Ershun Du,Miao,Ning Zhang
DOI: https://doi.org/10.1109/pesgm40551.2019.8973678
2019-01-01
Abstract:The variability and uncertainty of wind power generation significantly increase the fluctuation of transmission power flow. For transmission expansion planning (TEP) problems under high renewable penetration, one of the critical issues is how to balance the cost between wind power curtailment and transmission utilization rate. In order to address this issue, a stochastic transmission expansion planning model considering the transmission overload risk due to wind power uncertainty is proposed. Instead of satisfying all the network constraints in all the scenarios, we allow the transmission overloading with an accepted low probability. Besides, considering the impact of transmission topology on wind power investment, a transmission and wind power co-planning model is established. The effectiveness of the proposed method is illustrated through case studies on the modified Garver's 6-node test system and IEEE RTS-79 test system.
What problem does this paper attempt to address?