Multi-time Scale Scheduling of Gas System Based on Equipment Dynamic Modeling in Iron and Steel Industry

Qi Wang,Fan Zhou,Ying Liu,Zhongyang Han,Jun Zhao,Wei Wang
DOI: https://doi.org/10.23919/ccc63176.2024.10661595
2024-01-01
Abstract:In the iron and steel industry, the optimal scheduling of by-product gas is crucial to achieve safe and efficient energy operation. However, the scheduling method with a single-time scale cannot cope with the impact of forecast uncertainty. It is difficult to use static modeling to solve the impact of the multi-working condition characteristics of energy coupling equipment and the complex and changeable state of energy on scheduling. For solving the above problems, a multi-time scale scheduling method based on equipment dynamic modeling is proposed in this paper. The upper layer is day-ahead scheduling layer, which considers long-term energy information to establish an economically optimal rolling optimization scheduling model. The lower layer is intraday real-time scheduling layer, which is based on the solution results of day-ahead scheduling and combined with short-time scale energy information. The dynamic model of each energy coupling equipment is used for real-time scheduling. In order to verify the validity of the proposed method in this paper, an experiment was carried out on the operation data of the by-product gas system in the iron and steel industrial industry. The results show that the proposed method reduces the operating cost and has better application value compared with the traditional MPC optimal scheduling method that does not consider the dynamic characteristics of equipment.
What problem does this paper attempt to address?