Experimental Study on Optimization of Treatment Residual Stream Saving at Waterworks in Shenzhen

Cui Fu-yi
2011-01-01
Abstract:In order to reduce the water consumption at waterworks and save water resources,the experimental study on optimization of treatment residual stream saving was conducted at the S Waterworks in Shenzhen.By optimizing the sludge water conditions,the total water consumption rate of the S Waterworks can be reduced from 3.5% to 2.1%,saving water of 42.42 ×104 m3/a and production cost of 491.9 thousands yuan per year.The treatment residual stream reuse process can save the production cost of 486.6 thousands yuan per year,and the production cost per ton water is saved by 0.013 yuan.As a result,it is suggested that the treatment residual stream reuse process is added at waterworks located in areas like Shenzhen with high water resource fees.