ASSEMBLY AND TEST OF A MODIFIED SPECTROMETER SOLENOID FOR MICE

Derun Li,S. Prestemon,Heng Pan
2013-01-01
Abstract:ASSEMBLY AND TEST OF A MODIFIED SPECTROMETER SOLENOID FOR MICE * S.P. Virostek # , D. Li, H. Pan, S. Prestemon Lawrence Berkeley National Laboratory, Berkeley CA 94720, USA R. Preece, STFC Rutherford Appleton Laboratory, Didcot, Oxfordshire, UK Abstract The MICE superconducting spectrometer solenoids have been modified and rebuilt as a result of the testing done in 2008, 2009 and 2010. The number of two-stage cryocoolers was increased from three in 2009 to five in the modified magnet. The new radiation shield is fabricated primarily from 1100-O aluminum instead of 6061-T6 aluminum used in the former versions of the magnet. The thermal connection between the shield and the first-stage of the cold heads has been improved to reduce the temperature drop between the shield and the coolers. As a result of these changes, the first-stage temperatures for the coolers are below 45K, which resulted in an increase in the refrigeration generated by the cooler second stages. The quench protection system has been altered in order to provide additional protection to the magnet in the event of a lead failure between the magnet power supply and the magnet coils. The quality of the shield and cold mass MLI wrap has also been improved. Details of the modifications and final test and training results that demonstrate improved magnet performance are presented in this paper. diameter volume. The two match coils operate as a focusing doublet to match the beam to the adjacent AFC modules. Additional details of the spectrometer solenoid design and operating parameters have been presented in a previous paper [4]. Figure 1: CAD model of MICE cooling channel layout. INTRODUCTION The Muon Ionization Cooling Experiment (MICE) [1] is sited at Rutherford Appleton Laboratory (RAL) in England and will demonstrate the principle of ionization cooling using a muon beam. The cooling channel portion of MICE will consist of two different types of modules. The three absorber-focus-coil (AFC) modules [2] will each contain two superconducting focusing coils and a liquid-hydrogen absorber to reduce the 3-D momentum of the muon beam. The two RF and coupling-coil (RFCC) modules [3] will each contain a central superconducting coupling coil and four 201-MHz normal-conducting RF cavities to re-accelerate the beam. The two identical spectrometer solenoid modules are located at either end of the MICE cooling channel. A CAD model of the layout of these modules is shown in Fig. 1. A photo of the first completed spectrometer solenoid magnet during training at the vendor is shown in Fig. 2. The spectrometer solenoid modules each consist of five superconducting coils that are wound on a common 3-m- long aluminum mandrel (see Fig. 3). To measure the muon beam emittance as it enters and exits the cooling channel, a scintillating fiber tracking detector will be located in the bore of the three spectrometer coils, which generate a 4-T uniform field over a 1-m-long and 30-cm- Figure 2: First spectrometer solenoid during training. * This work was supported by the Office of Science, U.S. Department of Energy under DOE contract number DE-AC02-05CH11231. spvirostek@lbl.gov Figure 3: Spectrometer solenoid cold mass assembly.
What problem does this paper attempt to address?