Comparison of Post-Construction Settlement Prediction Method of Expressway Soft Soil Roadbed

Zhou Li
2009-01-01
Abstract:The author carries out the post-construction settlement prediction of the typical section of the expressway soft soil roadbed by using the Hushino method and the hyperbolic method,and analyzes the prediction error based on the measured data,obtains the applicability of two methods and the selection method of the starting time of the hyperbolic method.
What problem does this paper attempt to address?