An Approximation Algorithm for Quay Crane Scheduling with Handling Priority in Port Container Terminals

Der‐Horng Lee,Daoshun Wang
DOI: https://doi.org/10.1080/03052151003686708
IF: 2.5
2010-01-01
Engineering Optimization
Abstract:The quay crane scheduling problem studied in this article is to determine the handling sequence of ship bays for quay cranes assigned to a container ship considering handling priority of every ship bay. This article provides a mixed integer programming model for the considered quay crane scheduling problem that is 𝒩𝒫-complete in nature. An approximation algorithm is proposed to obtain near optimal solutions and a worst-case analysis for the approximation algorithm is performed. Computational experiments are conducted to examine the proposed model and solution algorithm. The computational results show that the proposed approximation algorithm is effective and efficient in solving the considered quay crane scheduling problem. Keywords: port container terminalquay crane schedulinghandling priorityapproximation algorithm
What problem does this paper attempt to address?