An integrated framework for quayside operation problem with continuous berths
Jiang Hang Chen,Jian Gang Jin,Jin Xin Cao
2013-01-01
Abstract:There are three kinds of operations for a typical port container terminal: quayside operation, yardside operation, and hinderland operation. One of the issues of quayside operation planning is known as the Berth Allocation Problem (BAP), which is the decision to assign the berthing location and service time to coming ships. In tradeitional fashion, after the decision of the BAP is made, according to the obtained berth layout, quay cranes, the industry-standard equipments which are mounted on the same tracks along the quay, are assigned and scheduled to unload and load containers from and to the ships. In the literature, this part of decision is referred to as the Quay Crane Assignment Problem (QCAP) and the Quay Crane Scheduling Problem (QCSP). Thus, in general terms, the quayside operation planning involves the BAP, the QCAP, and the QCSP. However, the quayside operation problem is not the simple sum of the three subproblems since they are highly interrelated. To get the insight into this, note that on one hand, the output of the BAP is served as the input for the QCAP and the QCSP; on the other hand, it is only possible to gauge the length of the handling time for each ship which is the key input for the BAP, after solving the QCAP and the QCSP. In light of this observation, to achieve a feasible and better planning for the quayside operation, the integration of the BAP, the QCAP, and the QCSP is extremely necessary and the studies on this problem is a phenomenal trend in this research society in the field of port container terminal management. After reviewing the existing works in the literature under this topic and identifying the common deficiencies in the previous researches, we develop two Mixed Integer Programming (MIP) mathematical formulations for the