Applied Research of Treatment Program for Soil Cave and Karst Ground

Li Shao
2013-01-01
Abstract:Basing on a pile foundation engineering example of an apartment in the region of complex karst foundation,a new method is applied with impact pore-forming pouring pile and high pressure jet grouting in solving the surrounding soft-plastic silty clay layer of soil hole and karst fissure fracture zone,and summarizing the advantages of impact pore-forming pouring pile in processing soil hole and problems in construction should be noticed.The engineering practice application effect is good,and provides the reference for the similar engineering.
What problem does this paper attempt to address?