Evaluation and Research on Replacement Reinforcement Quality at Abutment of Ultra-High Arch Dam Based on Prototype Monitoring

Bo Hu,Guan-biao Liu,Sijing Wang,Xiaoli Liu
IF: 2.4
2011-01-01
Journal of Hydraulic Engineering
Abstract:The prototype monitoring and derivation were integrated to study the reinforcement quality of replacement at abutment of the ultra-high arch dam in Xiaowan Project,China.The principles of monitoring layout and design are introduced in detail.According to the prototype monitoring,several facts are found:there is a compressive stress between the replacement body and surrounding rock mass,and two typical stages are found in the hydrograph of contact stress,namely increasing stage and stable stage.The joint opening hydrographs also show subsection characteristics,with three typical stages,namely compression stage,opening stage and stable stage.It seems that the joint opening and temperature have a sub-linear correlation relationship.The surrounding rock mass is stable.The surrounding rock mass within 16m from the wall is the loose zone caused by excavation,and the displacement increases very quickly in the first 6m.The theoretical calculated thermal stress of reinforcing bar steel well accord with the monitoring data.It may conclude that,the geology weakness bodies are well replaced,and the abutment is safe.
What problem does this paper attempt to address?