Analysis of Archdam Right Abutment Stability and Observation Results of Yanziqiao Hydropower Station

ZHANG Fan
DOI: https://doi.org/10.3969/j.issn.1671-3354.2011.02.005
2011-01-01
Abstract:The sliding fracture in Yanziqiao archdam right abutment was formed by bottom fractured(Fault F14) and lateral fracture(Fault F10).Through shear strength test of rock,abutment stability was calculated with rigid limit equilibrium method,and some corresponding project measures were taken.Six and half years' deformation observation results show the right abutment was stable.