A Capacity Planning Scheme Based on Deep Temporal Clustering of 500kv Main Transformers

Da Sang,Li,Xiaohu Zhang,Yunfei Zhao,Donghua Zhao
DOI: https://doi.org/10.1109/icpsasia58343.2023.10295000
2023-01-01
Abstract:In order to adapt to the new situation of power grid development, the power grid planning needs to modify to a more detailed planning mode and carry out the power grid transformation project accurately. This paper presents a capacity planning scheme based on deep temporal clustering of 500kV transformers, which can provide us with more elaborate information about dynamical partition of the main transformers. We utilize 500kV main transformers from the East China power grid to test our scheme. The results demonstrate that the capacity shortage for four provinces given by our method for 2022 is three percent less than planning for 2022 made by electricity planning department, and capacity shortage for 2025 is nearly one-third lower than that for 14th Five-Year Plan. By mastering the dynamic partition aggregation relationship of 500kV main transformer, considering the complementarity of power supply to 220kV region between multiple main transformers in the same division, we can locate the weak point of the power grid. We have applied the research results to form an intelligent capacity planning module for main transformer, we hope big data can assist enhancing the operation and administration level of the regional power grid, creating economic and social benefits.
What problem does this paper attempt to address?