Study on Branch-and-Price for Solving Single-Machine Total Weight Tardiness Scheduling Problem.

Zaichang Hai,Xingye Dong
DOI: https://doi.org/10.1007/978-3-031-36822-6_14
2023-01-01
Abstract:Single-machine total weighted tardiness scheduling problem (SMTWTSP) is a classic problem in the field of production scheduling, which is a NP-Hard problem. The branch-and-price based on a time-indexed formulation is used to solve it accurately. The influence that different column selection strategies of column generation have on the rate of algorithm convergence is studied. Two column selection strategies are proposed, which improved the efficiency of solving linear relaxation solutions compared with the classical column selection strategy. The precedence theorems are added to the process of branch-and-price to reduce the search space. The 40-job instances provided by OR-Library are solved successfully. And the time of working out each instance is increased by 1000 s on average. It is proved that changing the strategy of column selection can significantly improve the efficiency of branch-and-price, and the precedence theorems can reduce the search space of SMTWTSP through the results of this experiment.
What problem does this paper attempt to address?