High Field Experiment of 1.3 M-Long X-band Structure

T. Higo,E. Kadokura,Igor Mejuev,Hiroshi Sakai,K. Takata,Danian Dong,Hongbin Fang,Jiwei Nie,M. Gao
1998-01-01
Abstract:Two 1.3m-long X-band accelerating structures were made to study the fabrication of the structure for the main linac of linear collider. One of the structures is being highpower tested to confirm the basic high field performance of such a full-scale structure. Various experimental instrumentations were carefully prepared; recording the RF pulses as the break down occurs, recording the timing, position and strength of X-rays along the structure, measuring dark current towards upstream and downstream along the beam axis, etc. Using these monitoring devices, the process of conditioning for the structure until reaching the specified field level or beyond is being studied. In the present paper are described those instruments and a preliminary conditioning result up to a power level of 1 MW.
What problem does this paper attempt to address?