Development of a Special Tool for the Response Time Test of Safety Level DCS

PENG Pei-xing,HONG Shi-xin,QIU Bing-xian,WU Chen-lu,HE Cheng
2022-01-01
Abstract:The F-SC1/F-SC2 level DCS of Unit 1 and 2 of Zhangzhou nuclear power plant use the domestic NASPIC platform, which is the first commercial application in domestic nuclear power plant. As the carrier of the reactor protection system, the safety level DCS is mainly responsible for protecting the integrity of the three barriers of the nuclear power plant, and realizing the trip of reactor and startup of engineered safety features in case of emergency. Its response time is an important performance index of its working performance. With the increasingly strict nuclear safety regulator, the response time test of the safety level DCS of the third generation nuclear power plantwill strictly follow the regulation requirements of “performing the response time test of all channels of the safety level DCS every four cycles”, which will most likely lead to this work becoming a key main line during the overhaul. Therefore, a set of response time test device suitable for NASPIC platform is developed to reduce the construction period during overhaul, avoid becoming the main line construction period, and improve work efficiency.
What problem does this paper attempt to address?