Practice of Construction Quality Management System of Vibrating Replacement Gravel Pile

MA Bin,CHEN Daoxiang,LI Meng,DING Peng,LIN Peng
DOI: https://doi.org/10.3969/j.issn.1001-2184.2023.01.003
2023-01-01
Abstract:Vibration replacement gravel pile is one of the key technical methods to solve the problem of deep overburden layer in hydropower development in southwest China. As a concealed project,the construction quality management of vibration replacement gravel pile is affected by many adverse conditions. In order to overcome the problems in traditional vibration replacement gravel pile quality management system,such as human factors,low timeliness of quality management,based on the foundation treatment of Yingliangbao Hydropower Project,this paper the quality management process of vibration replacement gravel pile was combed,and a set of construction quality management system of vibrating replacement gravel pile was developed,which can effectively improve the construction quality management level of vibrating replacement gravel pile.
What problem does this paper attempt to address?