A Hyper-Heuristic Algorithm for the No-Wait Flowshop Scheduling Problem with Makespan Criterion

Yu Gao,Ziyue Wang,Liang Gao,Xinyu Li
DOI: https://doi.org/10.1109/cscwd54268.2022.9776169
2022-01-01
Abstract:The no-wait flowshop scheduling problem (NWFSP) has received widespread attention because of its wide application in the steel industry, food industry, and so on. This paper proposes a hyper-heuristic algorithm to solve it with the objective to minimize the makespan. Firstly, three Modified Nawaz-Enscore-Ham (MNEH) algorithms are designed to keep the diversity of initial values. Secondly, in order to fully search for potential solution domains, the Low-Level Heuristics (LLH) are constructed to speed up the search process for each neighborhood and the search order are decided by proposed High-Level Strategies (HLS). Thirdly, one taboo mechanism and two backtracking mechanisms are designed to promote the exploitation performance. No parameters are used in all stages. Therefore, it is not necessary to adjust parameters when it is used to solve any NWFSP problems and the equivalent Asymmetric Traveling Salesman Problems (ATSP). The test results of the Tailard benchmarks confirm the stability and effectiveness of the proposed algorithm.
What problem does this paper attempt to address?