A tight approximation algorithm for problem $$P2\rightarrow D|v=1,c=1|C_{\max }$$P2→D|v=1,c=1|Cmax

Yinling Wang,Yan Lan,Xin Chen,Xin Han,Yong Piao
DOI: https://doi.org/10.1007/s10878-020-00593-1
2020-01-01
Journal of Combinatorial Optimization
Abstract:This paper focuses on the scheduling problem on two parallel machines with delivery coordination. In particular, given a set of n jobs, we aim to find a schedule with a minimal makespan such that all jobs are first executed on two parallel machines then delivered at the destination with a transporter. This problem is known to be NP-hard Chang and Lee (Eur J Oper Res 158(2):470–487, 2004), cannot be solved with an approximation ratio strictly less than 3/2 unless P=NP. We close the gap by proposing a polynomial time algorithm whose approximation ratio is $$3/2+\varepsilon $$ with $$\varepsilon >0$$, improve the previous best ratio $$14/9 + \epsilon $$.
What problem does this paper attempt to address?