Research on Parallel Inspection Model and Key Technology of Distribution Transformer

Xing Li,Guangtao Wang,Chao Gu,Feifei Wang,Andong Wang,Fuqiang Zhao
DOI: https://doi.org/10.1088/1755-1315/512/1/012109
2020-01-01
IOP Conference Series Earth and Environmental Science
Abstract:In this paper, a parallel inspection model based on pipeline and multitask is designed innovatively for the large-scale sampling inspection of distribution transformer before putting into operation. According to the characteristics of inspection resource sharing, the key technologies such as resource allocation and task scheduling are optimized, and the resource optimization allocation method and task parallel scheduling algorithm are proposed. Compared with the former, the optimized parallel inspection model improves the inspection efficiency and resource utilization to a large extent, and has important application value in the modern factoryinspection mode.
What problem does this paper attempt to address?