Method for LSTM-Based Cascade Hydropower Plant Scheduling

Zhi Cai,Guofang Zhang,Yi Lu,Yuxuan Li
DOI: https://doi.org/10.1109/ccdc52312.2021.9602858
2021-01-01
Abstract:With the increase of the number of cascade hydropower plants and the increase of the discrete number of state variables in the time period to obtain more high-precision solutions, the calculation time increases exponentially, which makes it difficult to optimize through physical models. Therefore, a data-driven cascade hydropower plant scheduling method with self-learning abilities is proposed. Firstly, perform cluster pre-processing of the historical dispatching data of hydropower plants in the scheduling scope with K-means algorithm; secondly, establish a deep learning model of cascade hydropower plant schedules based on long short-term memory (LSTM), and build the mapping model among system load, water regimen and hydropower plant schedule through historical data training, to make a decision; finally, continuously correct the model by accumulating the historical data, so that it has the ability of self-evolution and self-learning. We make case analysis based on the actual power grid data, and the calculation results show the effectiveness of the proposed method.
What problem does this paper attempt to address?