Safety Risk Identification and Assessment for Beijing Olympic Venues Construction
Yu Sun,Dongping Fang,Shouqing Wang,Mengdong Dai,Xiaoquan Lv
DOI: https://doi.org/10.1061/(asce)0742-597x(2008)24:1(40)
IF: 6.415
2008-01-01
Journal of Management in Engineering
Abstract:New technologies, new materials, and innovative designs have been extensively adopted in Beijing Olympic venues construction. The extreme requirements for time deadline and competition function expose the venues construction to high risks. These risks would potentially bring negative impacts on the site safety performance. Meanwhile, there is a lack of systematic management for safety risks in China's construction industry, especially for large projects such as the Beijing Olympic venues construction. This paper identifies and assesses safety risk factors inherent in Beijing Olympic venues construction with the involvement of 27 experienced and highly respected experts from government agencies, the construction industry, and academe through brainstorming, workshop discussions, and questionnaire surveys. The finding reveals that more than half of the critical safety risk factors are from contractors and subcontractors such as: lack of emergency response plan and measures; workers' unsafe operation, and contractors ignoring safety under schedule pressure. Based on these critical safety risks, a risk register is composed and a model is developed in application of the analytic hierarchy process to assess the status of risks on site safety. The model has been attempted in two Olympic venue projects under construction and the validity has been approved. The risk checklist, register, and assessment model developed in the paper were integrated into the risk management system that has been used for Beijing Olympic venues construction.