Dynamic Dewatering Research Of Deep Foundation Pit During Excavation In Water-Rich Sandy Cobble Stratum Layer

Xi Chaobo,Fu Helin,Liu Weizheng
2019-01-01
Abstract:One-off large-scale dewatering in foundation pit engineering can easily cause uneven surface settlement. Dynamic dewatering can effectively control the total amount, period and scope of dewatering, and reduce the negative impact of foundation pit dewatering construction. Based on Qiu Buyi model and groundwater well flow theory, according to the hydrogeological characteristics of high water-rich sandy oval beds along the Yangtze River in Changsha, the calculation method of water inflow of single well and well group under the condition of no water-stop curtain during the dynamic dewatering process of foundation pit is obtained. Combining with No. 2 working well of Wanjiali Road Power Tunnel in Changsha, a seepage numerical model describing the groundwater level descending and tending to be stable caused by well group pumping is established. Considering the influence of water-stop curtain on seepage path in the process of groundwater seepage, the correction coefficient of foundation pit precipitation considering the influence of water-stop curtain in practical engineering is obtained. Through the optimal selection of well spacing, well number and pumping flow, good precipitation effect is obtained, which has engineering reference value.
What problem does this paper attempt to address?