Risk Management Of Tunnel Engineering

Jp Jia,Ht Wang,Gz Hu,Xg Jin,Jm Liu
2005-01-01
Abstract:In this paper, it is analyzed the generation time and position of accidents, deformation kinds of the supports and relations between tunnel driving methods and accident, summarized risk sources, given the risk grade and risk level, based on the idea of system safety theory, put forward the idea about making reliability decision firstly, and then making effectiveness decision. Based on these, it is advised to build initial system of tunnel engineering risk management according to the disadvantages of domestic tunnel engineering risk management system.
What problem does this paper attempt to address?