Theory Analysis And Engineering Study Of Yimin-Fengtun 500kv Tcsc Transmission System

J Liang,Jb Guo,Xx Zhou
1998-01-01
Abstract:Increasing load requires more power transferred from distant plants. However, it is difficult to construct more transmission lines to meet the load demand because of limit right of way(ROW). As a result, the Northeast China Electric Power Group plans to install thyristor controlled series compensation (TCSC) in the Yimin-Fengtun 500kV transmission system. The project also acquires support from the National Science Foundation and the Ministry of Electric Power of China. Research work involving system analyses is undertaken in the Electric Power Research Institute. This paper will discuss several aspects of theory and engineering studies and present some useful results for further studies. These studies include steady state and transient stability analyses, technology-economy comparisons, and controller design.