Evolutionary Game Analysis of Coordination Mechanism for Operation Period in Public-private Partnerships Projects

Jianbo ZHU,Qianqian SHI,Zhaohan SHENG
DOI: https://doi.org/10.3969/j.issn.1000-7695.2016.24.037
2016-01-01
Abstract:For the study of public-private cooperation mechanism in operation period of PPP projects,given the bounded rationality of government and the private sector,a public-private cooperation evolution model was established.By using this model,the mechanism of interaction between them,income distribution,incentive and supervision,cooperation cost and other factors affecting the evolution stability of the system were analyzed.The results show that the government should balance the excess income distribution to avoid the failure of supervision and incentive mechanism;the decrease of private cost and increase of excess income and supervision cost have a positive correlation with the cooperation of both sides;there is an optimal proportion of excess income allocation,which makes a win-win co-operation of both sides;a reasonable punishment mechanism can also promote bilateral cooperation.
What problem does this paper attempt to address?