Critical Chain Method: A New Project Scheduling Approach

ZHAO Dao-zhi,LIAO Hua,LIU Yi-liu
DOI: https://doi.org/10.3969/j.issn.1673-095x.2005.02.003
2005-01-01
Abstract:Critical Chain Method (CCM) is a burgeoning project scheduling technology based on the Theory of Constraints (TOC). CCM copes with duration uncertainties of the activities through inserting buffers. This paper introduces CCM's essential philosophy, using steps, the approaches to calculate the buffer sizes, and the existing difficulties in CCM as well as future researches are also discussed.