Inverse Scheduling Problem of the Total Weighted Completion Time Problem with Unit Processing Time on Identical Parallel Machines for Two Types of Norms l1 and l2

Hongtruong PHAM,Xiwen LU
DOI: https://doi.org/10.3969/j.issn.1002-8743.2014.01.008
2014-01-01
Abstract:In this paper we study the inverse scheduling problem of the total weighted completion time problem with unit processing time on identical parallel machines for two types of norm l1 and l2 .The weights are minimally adjusted so that a given target job sequence becomes an optimal schedule for two types of norm l1 and l2 under the constraints that the resulting objective value based on the adjusted weights is no larger than the original objective value .
What problem does this paper attempt to address?