A Study on the Project Scheduling Based on Multi-Agent Systems

HE Shu-guang,QI Er-shi,LI Gang
DOI: https://doi.org/10.3969/j.issn.1000-0984.2005.01.008
2005-01-01
Abstract:In recent years, modern engineering projects, especially large-scale engineering projects, have some new characteristics as following. 1) The projects are becoming larger and larger in scale. 2) The project complexity is increasing. 3) More and more projects can′t be executed successfully unless cooperate with others. According to these characteristics, this paper put forward a new modeling method based on Multi-Agent Systems (MAS) for the RCPSP (Resource Constrained Project Scheduling Problem) and it was verified by an experimentation.
What problem does this paper attempt to address?