Research on Marine Ship Production Scheduling System Based on Multi-Agent System

Fei Peng,Li Zheng,Ming Gong,Hui Zhou
DOI: https://doi.org/10.5004/dwt.2021.26872
IF: 1.1
2021-01-01
Desalination and Water Treatment
Abstract:Combined with the port distributed characteristics and role behavior model, the marine ship production scheduling system based on Multi-Agent System (MAS) is studied. The problems existing in the overall process of port scheduling are analyzed, such as longitudinal multi-level scheduling, low information sharing, local rationality, overall conflict, poor operation of scheduling plan, etc. The planning and scheduling model based on MAS and the cooperative framework of port dispatching system based on MAS are proposed.
What problem does this paper attempt to address?