The impact analysis and optimization of communication on rework risk between overlapped activities in R&D projects

Qing YANG,Zhilin LIU,Chen SHAN
DOI: https://doi.org/10.12011/1000-6788(2017)09-2384-10
2017-01-01
Abstract:Overlapping between activities is a fundamental feature in concurrent R&D project.Even though overlapping can reduce product duration,it also leads to rework risk and increase cost related with overlapping.In order to explore the impact of multicommunication between overlapped activities on rework risk,this paper builds the multicommunication-risk overlapping model and the calculation models of upstream activity's information modification rate and downstream activity's rework sensitivity.Then,the models of downstream activity's rework risk and rework workload are built.Furthermore,maximizing the objective function of saved project cost,the optimization results obtain the best communication frequency and communication interval.Finally,an industrial example is provided to illustrate the proposed models,the optimal results are conducted sensitivity analysis and simulation analysis which yield several managerial insights.
What problem does this paper attempt to address?