Virus genetic algorithm for flexible job shop scheduling

GU Feng,CHEN Hua-ping,LU Bing-yuan
DOI: https://doi.org/10.3321/j.issn:1001-506X.2005.11.039
2005-01-01
Abstract:To overcome the disadvantages of prematurity and slow convergence in genetic algorithm,a new algorithm is given which combines dynamicly main group's overall evolution with virus group' s local evolution.According to the characteristic of flexible job shop scheduling the main group's evolution is based on two crossover and mutation methods.Then,virus group is inducted to infect main group.Finally,the complex problem in flexible job shop scheduling is solved with it.The results show the effectiveness of the algorithm.
What problem does this paper attempt to address?