Design and Analysis of New Double-Hole Asymmetric Prestressed Reinforcement Slab

YU Lei,ZHANG Ji-wen,ZHAO Guo-tang,TU Yong-ming
DOI: https://doi.org/10.3969/j.issn.1672-7029.2009.04.005
2009-01-01
Abstract:In order to solve the three-side drainage and crack of slab bottom problems of common slab ballastless track in high-speed railway bridge,the new double-hole slab was desigened that differs from common slab track,and double-hole slab 3D models were built by using ANSYS software,the strain,deformation and bearing capacity of the new slab track were analyzed under two load case,and asymmetric prestressed reinforcement was designed under combined moment.The results show that the double-hole slabs can effectively solve the drainage problem,and have more stability than common slab ballastless track.The strain,deformation and crack width of the new slab track satisfies the requirements of standard.The maximum crack of slab bottom surface is decreased by the asymmetric prestressed reinforcement design under the same steel amount,the crack resistance capacity of double-hole slab track is 33.3% more than common slab ballastless track,and has better durability and economy.
What problem does this paper attempt to address?