Full scale model tests on slab track constructed on embankment

Jiang Hongguang,Bian Xuecheng,Chen Yunmin,Jiang Jianqun
DOI: https://doi.org/10.1201/b12754-81
2012-01-01
Abstract:High-speed train's pass will generate dynamic stress in subgrade soil, and very large cycles of train's operations will induce measurable permanent settlement. The axis of principal stress in soil element rotates when the train moves from negative infinity to positive infinity, and this leads to greater accumulative deformation of subgrade. A dynamic test apparatus of slab track of high-speed railway has been established in Zhejiang University. Then, a new simulation method of high-speed train traffic loadings is proposed in this paper, using a distributed loading system to represent the movement of wheel axle loads of trains. Some preliminary testing results are presented in this paper to show the capacity of the testing apparatus. The load sharing ratio of fastening system is studied by a single wheel axle load acting on the rail, and the stiffness of fastening system is also acquired. Dynamic response of slab structure under different train speed could be studied on the dynamic test platform, as well as subgrade settlement in future.
What problem does this paper attempt to address?