Calculation and Analysis of Several Methods of Obtaining 1.8 K Superfluid Helium

CHEN Yu,ZHENG Qing-rong,WANG Rong-shun,LIN Wen-sheng,LU Xue-sheng,GU An-zhong
DOI: https://doi.org/10.3321/j.issn:1006-2467.2005.02.016
2005-01-01
Abstract:Several plans on how to obtain the 1.8 K superfluid helium fitting for the system were put forward, including direct throttling, throttling process accompanied with pre-cooling, vacuum pumping and vacuum-pumping accompained with throttling process. Comparison and analysis between these plans were given, and the temperature-entropy figure, flow diagram, and equipments realizing the scheme of each progress were put forward. The liquid ratios of superfluid helium of the four different methods are determined through the T—S figure. The method of vacuum pumpng can give 100% superfluid helium ration in theory, but the equipment is complicated and the cost is high. The final liquid ratio of superfluid helium by vacuum-pumping accompanied with throttling process is 90.3%, and the complexity and the cost of the equipment is similar to the vacuum pumping plan. The equipments of direct throttling and throttling process accompanied with pre-cooling are simple compared to the above two methods. The throttling process accompanied with pre-cooling makes use of the cold energy of the saturated superfluid helium vapor of 1.8 K and the liquid ratio of this method can increase 12% compared to direct throttling method.
What problem does this paper attempt to address?