Research Progress of Cantilevered Scaffolding in High-Rise Building Construction

Hui HE,Fan-kui ZENG,Bao-ping LI,Bin CAI,Yan-feng HOU
DOI: https://doi.org/10.16185/j.jxatu.edu.cn.2015.01.001
2015-01-01
Abstract:Because of the initial defect of the frame body ,the connection mode of nodes ,the calculation methods of the frame body and other factors of the cantilevered scaffold body in high‐rise buildings , scaffolding collapses occur frequently in recent years .Based on the domestic research on the selection of the calculation model ,semi‐rigid of nodes and the initial defects ,a proposal for further development of cantilevered scaffold computational procedures and the instrumental cantilevered scaffold is canbe rduced and prevented put forward ,in the hope that it is able to reduce and prevent great engineering disasters of cantilevered scaffold can be reduced and prevented ensuring construction safety and promoting the sustainable development of China’s construction industry .
What problem does this paper attempt to address?