Application of Multi-level Double Wedge Cut in Large Section Tunnel Driving

De LI,Yi YANG,Rui LI,Ke-gang LI,Jian-ping LI
DOI: https://doi.org/10.3963/j.issn.1001-487X.2017.01.010
2017-01-01
Abstract:In the process of spillway tunnel construction in Ma'an Mountain reservoir in Mi Yi County,some problems came into being,such as lower utilization ratio of drilling hole and slow advance speed of tunnel,where the average drilling utilization ratio is only 75.6%.Secondly,poor blasting effect resulted in large amount of residual holes and large volume of foundation.Thirdly,half-borehole rate was less than 60%.Then,the multi-level double wedge cut solution was proposed.By increasing the excavation cycle footage,applying 5 stage cutting design,optimizing parameters of peripheral hole and interval charge,decreasing the linear charge density and the charge quantity,good blasting effects were obtained,such as the blasting hole utilization ratio reached up to 96.8%,no residual hole and foundation existed anymore and the half-borehole rate exceeded above 90%.Results show that,on the condition of large section of hard rock tunnel excavation,the multi-level segment wedge cutting is highly effective in expanding cutting cavity,which further reduces the hole numbers but also ensures good blasting effect.
What problem does this paper attempt to address?