Numerical calculation of shield cutter in sandy pebble stratum of Yellow River for Lanzhou Subway

Cheng YANG,Yuanming LAI,Xu WANG,Jianqiang GAO,Zhoubin WEI
DOI: https://doi.org/10.13465/j.cnki.jvs.2018.08.005
2018-01-01
Abstract:Aiming at the Yellowstone sand-pebble formation under the first shield of Lanzhou Subway,this paper selected a linear elastic model and extended the linear Drucker-Prager plasticity model to simulate the constitutive relationship of pebble material and established the numerical calculation model of shield rock breaking in rock-pebble formation.The rock breaking effect on the Yellow River pebble stratum in several different situations was analyzed when Blade cutting speed was 0.6 m / s,0.8 m / s,1.0 m / s,1.2 m / s;cutting depth was 6 mm,9 mm,12 mm,15 mm,18 mm;cutter spacing was 12 cm,16 cm,20 cm,24 cm;The rake angle was 10 °,15 °,20 °,25 ° According to the calculation results,when the blade rake angle is 20 °,the pebble equivalent stress suddenly increases to provide rock breaking stress,and the rock breaking effect is the best.In addition,the rock breaking effect was analyzed when the hob pitch is 8 cm,12 cm,16 cm,20 cm,25 cm,30 cm and 36 cm respectively.The rock breaking effect was the best when the hob pitch was between 12 cm and 16 cm.
What problem does this paper attempt to address?