HHT analysis on blasting vibration signal of different cut method

Kai YUAN,Zhong-wen YUE,Xiao-qiang FU,Ming-yang LI,Shi-chun ZHANG
DOI: https://doi.org/10.11799/ce201805028
2018-01-01
Abstract:In order to study the influence of drilling technology on stability of roadway surrounding rock, and to realize the fine blasting and reduce the damage of surrounding rock, cylinder cut and wedge-cut blasting scheme are designed and the corresponding blasting experiments are carried out. The detection of blasting vibration signals is analyzed using HHT method and the time-frequency distribution and energy spectrum of the signal are obtained. Finally, the two cutting schemes are compared and analyzed. The result shows that, main frequency of cylinder cut is higher and the main frequency band is smaller, and the high frequency energy is larger. The main frequency of the wedge-shaped cutting signal is lower but the frequency band is wider, the lower frequency energy ratio in the signal increases, and the surrounding rock damage of the former is greater than the latter, which both can guarantee the stability of roadway surrounding rock.
What problem does this paper attempt to address?