BLASTING VIBRATION ANALYSIS OF LITTLE-SPACE ROAD TUNNEL

YANG Sheng-quan,ZHOU Jian,LI Xue-jian
DOI: https://doi.org/10.3969/j.issn.1006-7051.2005.03.019
2005-01-01
Abstract:The monitoring analyzation of blasting vibration was regarding an excavation of a new tunnel under a road close to an old one in little-space involved in the 2nd term engineering of road tunnel excavation and was conducted through analyzing the PPV of blasting vibration and its main frequency.The present paper introduced the principles of how to determine the monitoring points and lines together with observation information and results.A attenuation formula of PPV of blasting vibration and v-ρ correlation curve were obtained.The curve showed that the maximum peak values of blasting vibration velocity appeared frequently at the point where the apex of arch in same section,the radial direction and the blasting center were in the minimum distance in between,with the main frequency falling into 15~75Hz,dominantly into 22~50Hz.The outcome indicated that,the peak value of PPV and its corresponding main vibration frequency were closely correlated with the blasting method and blasting center distance,and tnat,blasting ability and blasting center distance had great influence on blasting seismic effects.And as a result,full-face blasting was the best blasting method in terms of controlling the blasting seismic effects.
What problem does this paper attempt to address?